The project involved the refurbishment of the existing Leisure Centre including the provision of a 95-station fitness suite, a new mutli-purpose studio, refurbished dry-side changing facilities and remodelled wet-side changing, a new reception area, cafe and conference suite.  The Leisure Centre remained operational for the duration of the project. 

The NEC Contract Option A was applied.