Go Back
Client
MGT Teeside Ltd
Project Value
£1 billion +
Services Provided
Capital Allowances Advisory Services
About the project
ChandlerKBS was commissioned to prepare a detailed capital allowances assessment on the expenditure being incurred on the design, construction and commissioning on this major Biomass Power Station. The main assets include a single 299MW circulated fluidised bed boiler, a steam turbine, a generator, air-cooled condensers, non-catalytic reduction unit, fabric units, a CFB exhaust stack, a fuel storage area and electrical transformers and switchgear buildings.