Enviroparks Hirwaun Ltd
Project Value
£200 million
Services Provided
Pre-Contract Commerial and Procurement Support and Post-Contract Cost Management
About the project
Enviroparks Hirwaun is a new material recovery and energy-from-waste facility in South Wales. The proposed facility is intended to process up to 238,000 tonnes of non-hazardous waste per year from within the region and produce enough electricity for 25,000 homes per year, divert 90% of wastes received from landfill, create up to 100 permanent jobs, achieve Welsh Government recycling targets and offer a viable alternative to incineration.
The project is split into two phases:
Phase 1
Fuel Preparation Area / Materials Recycling Facility to separate incoming feedstock into recyclates, refuse derived fuel, secondary derived fuel and aggregates.
Phase 2
Gasification plant and associated equipment.
ChandlerKBS provided services including:
- The development of an optioneering tool for the appraisal of various gasification technologies and project financial viability.
- Cost estimating for Capex and Opex elements including whole life costing.
- Value engineering and risk analysis to achieve financial closure.
- Procurement of an EPC contractor.
- Contract advice, preparation of contract documents, and target price agreement.